The The Archipelago Record

Committee of Adjustment

June 16, 2023

Who was there

Present (7): David Ashley, Alice Barton, Laurie Emery, Darlene Cade Fraser, Dan MacLeod, Earl Manners, Scott Sheard

Absent (1): Tom Lundy

Taken from the roll call in the town’s own minutes. The minutes record who was not there and almost never why.

What was decided (5 motions)

5 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.

NOW THEREFORE BE IT RESOLVED that the Agenda for the June 16th, 2023, Committee of Adjustment hearing be approved. Disposition
Moved by B. Liverance, seconded by D. Cade Fraser
Carried
NOW THEREFORE BE IT RESOLVED that the minutes of the Committee of Adjustment hearing held on May 26th, 2023, be approved as circulated. Disposition
Moved by D. Ashley, seconded by E. Manners
Carried
NOW THEREFORE BE IT RESOLVED that Application No. A09-23, seeking relief from Section 5.36 h), to permit the construction of an 18.2 square metre (195.9 square feet) sleeping cabin with an attached deck, having a side yard setback of 1.8 metres (6.0 feet), on this 0.58 hectare (1.46 acre) property, be approved , subject to: building permits for these works be secured within 2 years from the date of the decision; and development of the property shall proceed in substantial compliance with the plans and drawings submitted with the application. Disposition
Moved by B. Liverance, seconded by D. Ashley
Carried
NOW THEREFORE BE IT RESOLVED that Application No. A07-23, seeking relief from Section 6.1.3h), to permit the construction of a main dwelling with a ground floor area of 111.5 square metres (1,200 square feet), having a maximum height of 6.9 metres (22.6 feet), located on this 0.312 hectare (0.77 acre) property, be approved , subject to: building permits for these works be secured within 2 years from the date of the decision; and development of the property shall proceed in substantial compliance with the plans and drawings submitted with the application. Disposition
Moved by B. Liverance, seconded by D. Ashley
Carried
NOW THEREFORE BE IT RESOLVED that Application No. A03-23, seeking relief from Section 5.7a), to permit the construction of a new, attached deck, which will have a front yard setback of 2.44 metres (8 feet), be 2 metres (6.6 feet) above final grade, and will front the entire length of the existing main dwelling, be approved , subject to: building permits for these works be secured within 2 years from the date of the decision; and development of the property shall proceed in substantial compliance with the plans and drawings submitted with the application. Disposition
Moved by D. Cade Fraser, seconded by B. Liverance
Carried

The town’s own record

Read the minutes this page was read from →

Where this page and that document disagree, the document is right and this record is wrong. Say so and it will be corrected.